C
Callout fee
A minimum charge to cover travel and the first hour on site, regardless of the actual work carried out.
Certificate of Compliance
A document confirming installed work meets the relevant regulations β e.g. Part P for electrical, Gas Safe for gas.
Changeover
The turnover between one short-let guest checking out and the next checking in. Involves cleaning, linen and restock.
Chargeable work
Work billed to the customer, as opposed to warranty or goodwill work.
Consumer unit (CU)
The fuse board that distributes electricity around a domestic property, incorporating circuit breakers and RCDs.
D
Dispatch board
The visual schedule showing which engineer is going to which job at what time.
E
EICR
Electrical Installation Condition Report. A periodic inspection identifying C1, C2, C3 or FI classifications.
End-of-tenancy clean
Deep clean carried out between long-let tenants, often required for deposit return.
F
F-Gas
UK/EU regulation covering fluorinated gases used in refrigeration and air-conditioning. Requires certified engineers.
Fixed fee
A quoted total price for a defined scope, regardless of hours taken.
G
Gas Safe
The UK register of engineers legally permitted to work on gas appliances.
H
Handover
The point at which a job is signed off with the customer or property manager β usually with photo evidence.
HSP
Home Service Pro. A tradesperson or small firm delivering property services.
I
Invoice terms
The agreed payment window β commonly Net-7, Net-14 or Net-30 for property managers.
J
Job card
The record of a single job, containing scope, photos, materials, time and cost.
L
Landlord safety certificate
Legally required certificates for rented property (gas, electrical, EPC).
Line item
A single row on a quote or invoice describing one component of the work β labour, materials or fee.
Long-let
A tenancy of 6+ months. Distinct from short-let / holiday-let.
M
Making good
The finishing work needed after a trade job β plastering, painting, sealing β often excluded from the primary quote.
Materials markup
The percentage added to material cost when charging the customer. Commonly 15β30% for domestic trades.
MLA
Master Locksmiths Association. UK trade body for vetted locksmiths.
N
NICEIC / NAPIT
UK competent-person schemes for electricians allowed to self-certify domestic electrical work.
O
Overhead
Fixed business costs β van, insurance, tools, phone β that must be recovered across chargeable jobs.
P
Payment link
A URL sent to the customer allowing them to pay a specific invoice by card or bank.
PM
Property Manager. A person or company managing rental properties on behalf of owners.
Preferred vendor
A trade formally added to a property manager's approved supplier list for repeat work.
Q
Quote
A binding price for a defined scope of work, as opposed to an indicative estimate.
R
RCD
Residual Current Device. A safety switch that trips on earth faults. Required on most modern circuits.
Remedial work
Follow-up work required to bring an installation back into compliance after inspection.
S
Scope of work (SOW)
The written definition of what is included in a job. The single most important protection against disputes.
Service contract
A recurring agreement β annual boiler service, quarterly AC maintenance β with a scheduled visit and fixed price.
Short-let / STR
Short-Term Rental. A property let for nights or weeks via Airbnb, Vrbo or Booking.com.
Snag list
A list of defects identified at handover that require the trade to return and rectify.
T
Turnover (STR)
The full cleaning, linen and restock process between short-let guests.
V
Variation
A change to the agreed scope, priced and approved before work continues.
W
Warranty work
Work carried out at no charge to remedy a defect covered by the original guarantee.